Our goal is to be as educated and up to date on current practices and innovations to provide you with the best design and environmentally friendly wastewater system possible.

MEINCO designs residential and commercial wastewater systems.

Any new construction utilizing a wastewater system requires a permit for construction from the Arkansas Department of Health.

Typical Wastewater System Designs

  • Traditional field lines, gravity
  • Traditional field lines, dosed, low pressure dose
  • Advanced treatment, drip disposal
  • Advance treatment, direct discharge (NPDES permit required)

Contact Us

501-821-3837

Ask a question, schedule work, or get an estimate. Give us a call or fill out our contact form to get started!

Contact Us